Display Services Brio Project
- Date: On going
- Client: The City of El Paso
- Project Type: Placing Brio Bus Stop Canopies.
About this Project
We worked with Display Services putting up the Brio Bus Stop canopies in our city:
- Crane Operator
- 2 Large Cranes
- Current over 12 locations placed.
What is Brio Transportation System in El Paso, Texas
29 BRT station constructed curbside at 15 intersections
10-minute peak service, 15-minute off-peak service
100% locally funded project
CNG-fueled buses help to reduce emissions and pollution.
Mesa Corridor
22 BRT Station constructed curbside at 11 intersections
10-minute peak service, 15-minute off-peak service
Funded by City of El Paso, TxDOT, and FTA
First operation rapid transit corridor in El Paso
Monthly ridership of 60,000
Features
Operated by Sun Metro and complements the existing fixed route services CNG-fueled buses help to reduce emissions and pollution Exceeded average daily projected ridership within first 11 days of service Montecillo mixed-use development is utilizing adjacent Brio stops as anchors for development.
Services
Design
Structural Engineering
Transportation Services
Client
City of El Paso